Q2 Metals Intercepts 179.6 Metres of Continuous Spodumene Pegmatite in Large Step-Out at the Cisco Lithium Project in Quebec, Canada

Q2 Metals Intercepts 179.6 Metres of Continuous Spodumene Pegmatite in Large Step-Out at the Cisco Lithium Project in Quebec, Canada

For Immediate Release
2025-03-19 07:07:00

Highlights:

  • Drill hole CS25-027 encountered seven (7) spodumene pegmatite intervals, with the widest continuous interval of 179.6 metres (m), followed by two additional intervals of 58 m and 91.8 m of continuous spodumene pegmatite.

  • Drill…

Article Source
https://www.juniorminingnetwork.com/junior-miner-news/press-releases/1211-tsx-venture/qtwo/177004-q2-metals-intercepts-179-6-metres-of-continuous-spodumene-pegmatite-in-large-step-out-at-the-cisco-lithium-project-in-quebec-canada.html

More From Author

Google could pay Wiz .2 billion if acquisition falls through | CTech

Google could pay Wiz $3.2 billion if acquisition falls through | CTech

The AI Graveyard: 7 Deadly Mistakes That Kill Most Enterprise AI Projects

The AI Graveyard: 7 Deadly Mistakes That Kill Most Enterprise AI Projects

Listen to the Podcast Overview

Watch the Keynote