Q2 Metals Drills 347.1 m at 1.35% Li2O Including 30 m at 1.76% Li2O at the Cisco Lithium Property, James Bay, Quebec, Canada

Spread the love

Highlights:

  • Three (3) drill holes with strong analytical results from the summer drill campaign are reported herein and highlights include:

    • CS-24-021: Widest interval at 347.1 metres (“m”) at 1.35% Li 2 O, including seven (7)…

Article Source
https://www.accesswire.com/935912/q2-metals-drills-3471-m-at-135-li2o-including-30-m-at-176-li2o-at-the-cisco-lithium-property-james-bay-quebec-canada