Critical Survey: Tenaga Nasional Bhd (TNABY) vs. Azure Power Global (NYSE:AZRE)

0
30
Azure Power Global logo


Tenaga Nasional Bhd (OTCMKTS:TNABY) and Azure Power Global (NYSE:AZRE) are both utilities companies, but which is the superior stock? We will contrast the two companies based on the strength of their earnings, analyst recommendations, institutional ownership, profitability, valuation, dividends and risk.

Profitability

This table compares Tenaga Nasional Bhd and Azure Power Global’s net margins, return on equity and return on assets.

Net Margins Return on Equity Return on Assets
Tenaga Nasional Bhd N/A N/A N/A
Azure Power Global 0.24% 0.81% 0.15%

Volatility & Risk

Tenaga Nasional Bhd has a beta of 0.6, meaning that its stock price is 40% less volatile than the S&P 500. Comparatively, Azure Power Global has a beta of 1.94, meaning that its stock price is 94% more volatile than the S&P 500.

Valuation and Earnings

This table compares Tenaga Nasional Bhd and Azure Power Global’s top-line revenue, earnings per share (EPS) and valuation.

Gross Revenue Price/Sales Ratio Net Income Earnings Per Share Price/Earnings Ratio
Tenaga Nasional Bhd $10.94 billion 1.52 $1.59 billion N/A N/A
Azure Power Global $118.27 million 4.07 -$12.60 million ($0.65) -18.12

Tenaga Nasional Bhd has higher revenue and earnings than Azure Power Global.

Insider & Institutional Ownership

0.0% of Tenaga Nasional Bhd shares are owned by institutional investors. Comparatively, 51.8% of Azure Power Global shares are owned by institutional investors. Strong institutional ownership is an indication that large money managers, hedge funds and endowments believe a company will outperform the market over the long term.

Dividends

Tenaga Nasional Bhd pays an annual dividend of $0.40 per share and has a dividend yield of 3.4%. Azure Power Global does not pay a dividend.

Analyst Ratings

This is a breakdown of recent recommendations and price targets for Tenaga Nasional Bhd and Azure Power Global, as provided by MarketBeat.

Sell Ratings Hold Ratings Buy Ratings Strong Buy Ratings Rating Score
Tenaga Nasional Bhd 0 0 0 0 N/A
Azure Power Global 0 1 4 0 2.80

Azure Power Global has a consensus target price of $22.00, indicating a potential upside of 86.76%. Given Azure Power Global’s higher probable upside, analysts plainly believe Azure Power Global is more favorable than Tenaga Nasional Bhd.

Summary

Azure Power Global beats Tenaga Nasional Bhd on 8 of the 11 factors compared between the two stocks.

Tenaga Nasional Bhd Company Profile

Tenaga Nasional Berhad engages in the generation, transmission, distribution, and sale of electricity in Malaysia and internationally. It operates and maintains thermal generation assets and hydroelectric power generating schemes, as well as supports six independent power producers; and manages and operates the National Grid, which is connected to Thailand's transmission system in the north and Singapore's transmission system at Senoko in the south. It also supplies fuel and coal for power generation; generates, distributes, supplies, deals in, and sells various energy sources, as well as provides related technical services; develops district cooling systems; operates and maintains co-generation works; develops, owns, and manages dry bulk terminals; and manufactures, sells, and repairs distribution, power, and earthing transformers. In addition, it provides turnkey contracting of transmission substations; repair and maintenance services to heavy industries, as well as other related services; higher education, and information and multimedia services; research and development services in the areas of engineering, information technology, business, accountancy, and liberal studies; power plants operation and maintenance; and training courses. Further, it assembles, manufactures, tests, reconditions, and distributes high and medium voltage switchgears, and control gears for transmission and distribution of electric power; manufactures and distributes power and general cables, and aluminum rods; designs, engineers, procures, constructs, tests, commissions, operates, maintenances, and finances power plants; operates and maintains cooling plants; operates an integrated district cooling systems for air conditioning systems of office buildings; and provides technical and laboratory, and consultancy and other services. It primarily serves commercial and industrial, and residential customers. The company was founded in 1949 and is headquartered in Kuala Lumpur, Malaysia.

Azure Power Global Company Profile

Azure Power Global Limited, together with its subsidiaries, engages in the development, construction, ownership, operation, maintenance, and management of solar power plants in India. It generates solar energy based on long-term contracts with Indian government energy distribution companies, as well as other non-governmental energy distribution companies and commercial customers. As of March 31, 2018, the company had a portfolio capacity of approximately 1,871 megawatts. Azure Power Global Limited was founded in 2007 and is based in New Delhi, India.

Receive News & Ratings for Tenaga Nasional Bhd Daily – Enter your email address below to receive a concise daily summary of the latest news and analysts' ratings for Tenaga Nasional Bhd and related companies with MarketBeat.com's FREE daily email newsletter.



Source link

LEAVE A REPLY

Please enter your comment!
Please enter your name here